A quick list of completed projects to date (after all of the moving in and unpacking, of course):
--One tree in the front yard was cut down (diseased). A useless plant/bush with a gigantic weed growing in the middle of it was also pulled.
--Bathroom and ceiling in the office/brewery has been painted.
--Clothes line in the backyard has been setup.
--House and office have been blessed!
--2 worm bins have been setup and the worms are doing well.
--1 pineapple sage, 1 Mexican sage, and 1 rosemary bush have been planted in the backyard.
--2 blueberry and 2 black berry bushes have been planted along drive way.
--1 4x4 raised bed box has been built.
--Some muscadines have been picked by friends.
--Someone from Lowe's is coming out to give us an estimate on the front/side gate.
We are excited and busy!
9/28/2009
Subscribe to:
Posts (Atom)